

FLORIDA HAS MORE THAN ONE WIND REQUIREMENT
Florida's unique geography and hurricane risk require different wind speeds and design requirements across the state. Our designs follow the latest Florida Building Code (FBC) and ASCE 7 standards to ensure your structure is safe, durable, and built for the elements.
-
Town & County-specific wind maps
-
Proper exposure classification
-
Florida Building Code (FBC) compliance
-
ASCE 7 design standards


THREE QUESTIONS DETERMINE THE WIND DESIGN
The wind design for your building depends on three key factors:

WHERE'S WIND
PEED?
The location's wind speed determines the design pressure.

WHAT IS THE RISK
CATEGORY?
The level of design pressure required for the structure.

WHAT IS THE SURROUNDING EXPOSURE?
Whether the site is open, partially exposed, or protected by other structures.
RISK CATEGORY I VS. RISK CATEGORY II
Florida uses different levels of wind design pressure based on the building's intended use.

RISK CATEGORY I
-
Lower design wind pressure
-
Typically used for agricultural, storage, and
-
most standard metal buildings
-
Examples: warehouses, garages, barns, workshops

RISK CATEGORY II
Higher design wind pressure
Used for buildings with higher occupancy or importance
Examples: commercial buildings, schools, public facilities

OUR FLORIDA BUILDING PROCESS
From quote to completion, we follow a clear process to ensure your building meets all Florida requirements.
01
Review Your Location
We check your property address to determine the correct wind speed.
02
Confirm Code & Requirements
We design your building to meet Florida Building Code and local regulations.
03
Engineering & Design
Your building is engineered for your wind speed, risk category, and exposure.
04
Manufacturing & Delivery
We manufacture to exact specifications and deliver to your site.
05
Support Through Completion
We're here to assist until your building is fully in place.
QUESTIONS BEFORE YOU APPLY?



